New Connection Cost Calculator for Industrial/Commercial premises
Please mention load between 0 and 4800 kW


Disclaimer: This is a tentative cost calculator, based on standardized packages and that actual cost may vary subject to physical survey and final scheme design/planning. Additionally, it may please also be noted that for High Tension Bulk Supply, Meter and Cabling (Low-Tension) parts are not covered in the costing. ¹ Dedicated Feeder: Applicant having load requirement of above 2000 kW require a Dedicated Feeder, estimated cost of which is included in Infrastructure Cost in the estimate above.
² Feeder sharing charges are applicable to applicants in following cases:
a) Those having load requirement between 500 kW and 2000 kW, (where applicant is eligible for Dedicated Feeder but does not opt for it).
b) Those opting for High Tension Bulk Supply and having load requirement of less than 500 kW.
³ PMT sharing charges are applicable where applicant is eligible for Dedicated PMT but does not opt for it in the following cases: a) Industrial applicants having load requirement between 20 kW and 40 kW,
b) Commercial applicants having load requirement between 20 kW and 80 kW.